Perricone Farms Juices

video thumb
video thumb
video thumb
video thumb

“After three competitive bids we made our final selection to go with CPS West for three reasons; price, quality, and service.   The floor coating project we were having installed was in an old 4,400 square feet cooler, over an existing concrete floor around various structural changes.  The project scope required a sanitary non-skid floor that would slope to drains and resist heavy citric acid and foot traffic conditions.  Plumbing contractors installed drains the length of the room with stainless steel covers.  Structural contractors installed numerous mezzanine uprights and footings imbedded in ground.  CPS West applied a multiple coating floor to add the finishing touches on require floor work.  CPS West worked in coordination with all the contractors and Perricone Project Team to allow for an efficient move-in and move-out plan.  This move-in work required nights and a weekend in order to meet a strict project schedule.  The installation team was very professional and clean.  The owner Craig personally came by several times to make sure this floor project was on schedule and met our strict standards”

Jerry Badeau – Plant Manager

Perricone Farms

HOW CAN WE
HELP YOU?

Use this form to send your questions
or feedback. We will get back to you
as soon as possible.